A forecast is not a decision
Knowing tomorrow's demand does not tell you which load can move, when, or by how much.
NexGrid by LigeroNex
NexGrid forecasts a site's demand, finds the load that can safely move within your physical, contract and product limits, and measures the result against a baseline agreed in advance. A person approves every action. Everything below is a working preview with fictional data.
The problem
Most sites know their bill. Few can say how much load can really move without breaking a process, or what a shift was worth once it was made.
Knowing tomorrow's demand does not tell you which load can move, when, or by how much.
What can safely move depends on temperatures, processes and contracts that are rarely written down in any system.
Without a baseline agreed in advance, a saving is a claim your finance team has no reason to accept.
How it works
Half-hourly meter, generation and asset data, checked for units, gaps, duplicates and clock changes before it is used.
Demand and on-site generation for the day ahead. A forecast that does not beat simple baselines is not used.
Physical, contractual and product limits, written down with your site team and kept as versions.
An optimiser proposes shifts that stay inside every limit. A plan that breaks one cannot be produced.
Each opportunity shows the limit that binds it, its confidence and a value range. You approve or reject.
What actually happened, against a baseline whose method was agreed before the first recommendation.
Try it yourself
Press Run tomorrow's plan, open an opportunity, approve or reject it, then show the next day's result. It takes about two minutes. The company, the site and the figures are fictional.
How it is designed
NexGrid is designed around four ideas.
The optimiser works inside your limits, so a plan that breaks one cannot be produced. Zero broken limits is a release rule.
When data is stale or confidence is low, NexGrid recommends nothing, and says why.
Each plan records its data snapshot and versions, so it can be recreated exactly, even after the meter data is corrected.
How the saving is measured is agreed in writing first, so the result is a measurement and not a claim.
No language model decides anything. Forecasts use statistical methods that are tested against simple baselines, and the schedule comes from a mathematical optimiser. Every recommendation can be traced to one run and one data snapshot.
Limits
A product that influences physical equipment has to be clear about where it stops. We put these in writing at the start.
Working with us
Small on purpose: one site, flexible equipment that is not critical, and an agreed period. What counts as success is agreed in writing before it starts.
The reduction in peak demand on the days a change was approved.
Against the agreed baselineFlexible capacity found, compared with what was actually delivered.
Estimated against measuredForecast error on days the model had never seen.
Against simple baselinesWhere NexGrid is today. NexGrid is at the design stage: nothing on this page has been built yet, and we are looking for a first design partner. This site is a preview of the intended product, and every figure in it is illustrative. The first step with a partner is a feasibility study on their own half-hourly data.
Next step
Tell us about your sites. We will walk you through the preview and what a first study could look like.
Talk to LigeroNex → info@ligeronex.com